Typical timber frame installation crane day:

Typical timber frame installation crane day

Typical timber frame installation crane day

Katy Hall - 31-Jan-2024

The Timber Frame Installation crane day illustrated below shows two roofs (top hats) being removed and first floor panels installed. Then the roofs went back on, ready for the roofers.

At SC4, we’re an established commercial joinery and carpentry business with more than 20 years of experience delivering top-quality carpentry, timber frame installation and decorating work throughout Hampshire and surrounding regions. We exclusively hire qualified tradespeople who are comfortable and experienced at taking a collaborative approach to contract work. This ensures we can deliver high-quality work safely, on time, and to your satisfaction, helping you keep costs down and prevent delays while sustaining quality.

We invite you to browse our website to see the level of professionalism you can expect from us and find out why our clients come back to us again and again.

Timber frame installationFirst Floor timber frame arrives on site for installation in two new homes, January 2024
Timber frame installationThe crane sets up.
Timber frame installationThe roof is craned off from where it has been stored on the ground floor walls.
Timber frame installationThe roof is craned off and placed on the ground next to the plot where it has been stored on the ground floor walls.
Timber frame installationThe first floor wall panels are lifted into place.
Timber frame installationInstallation of the first floor wall panels.
Timber frame installationMore panels are unloaded.
Timber frame installationThe first floor walls are complete and the roof (top hat) is lifted into place.
Timber frame installationThe roof is back on, ready for the roofers to start work.

SC4 Carpenters Invite

Click on the categories below to find out more about:

Commercial Carpentry, Painting and Decorating services

Connect with Us

Connect

Share this Page

share

More Posts